From Feasibility to Finished Building: How Expose Delivers a Project

A multiplex or custom home involves more than drawings. Feasibility, architectural design, permits, and construction coordination each have their own decisions, documents, and risks — and they have to connect. This page explains the complete delivery process at Expose Design Group, and exactly what Expose handles versus what its consultants provide.

Expose Design Group is a Toronto architectural design studio founded in 2015 by Orod Tajdaran, an architectural designer and consult-build with 28 years in construction and 20 years as an architectural designer and interior designer. From 2016 the studio added build consulting and general contracting to its design practice.

Stage 1: Feasibility

Before design begins, we test whether the project works. For a multiplex, that means: can the lot support a five-unit minimum, what unit sizes does as-of-right zoning allow, do area rents justify building, and which typology maximizes rent and unit mix. For a custom home, it means testing the lot, the zoning envelope, and the brief against each other before drawings start.

Expose handles: the feasibility assessment, unit mix and typology advice, and the plain-language report.

Consultants: none are typically required at this stage, unless the lot has a servicing or environmental question that needs a specialist read.

Stage 2: Architectural and Interior Design

Design is where the building takes shape — exterior architecture, floor plans, and interior design developed together, not as separate exercises. For multiplexes we usually prefer townhouse and stacked-townhouse forms at the five-to-seven-unit size, because they deliver better rents at the same unit size with less wasted common area and lower construction cost. For custom homes, the exterior architecture, interior details, and construction method are designed as one coherent project.

Expose handles: architectural design, interior design and interior architecture, and the full drawing package.

Consultants: the professional engineer partner, whose stamp the drawings carry. Orod is not a BCIN designer, so Expose’s drawings go out with its professional engineer partner’s stamp. Other licensed consultants — structural, mechanical, and similar disciplines — are engaged as the project requires.

Stage 3: Permits

A building permit is required even when a design is as-of-right. Expose prepares the permit submission package: the drawing set, the required forms, and the supporting documents. The owner reviews and approves the package before anything is submitted, and some portals require the owner’s own login or acceptance of terms of use.

Expose handles: preparing the submission package and following up with the city by email.

The owner handles: final review, approval, and signature, plus any portal acceptance that only the owner can complete. Expose cannot sign or stamp on the owner’s behalf.

Stage 4: Construction Coordination

Where engaged, Expose stays involved through the build as construction consultant: reviewing progress against the drawings, coordinating with trades and consultants, and helping resolve the buildability questions that only appear once construction starts. This is the consult-build role — design that was made to be built, supported by someone who has built.

Expose handles: construction consulting and coordination, where engaged.

Consultants and trades: the builder and licensed trades execute the work; the professional engineer and other consultants answer for their own disciplines.

What Expose Does Not Do

We do not take small renovation or basic permit-drafting jobs — no load-bearing wall removals, window or door openings, or kitchen extensions as standalone work. We also do not arrange financing, appraise property, or give legal advice; your lender, appraiser, and lawyer cover those.

Frequently Asked Questions

Who stamps the drawings?

Expose’s professional engineer partner. Orod is an architectural designer, not a BCIN designer, and does not hold himself out as an architect — a protected title in Ontario.

Do I still need a permit if my project is as-of-right?

Yes. As-of-right means the use and scale are permitted under zoning. A building permit is still required.

Can Expose also build my project?

Expose added build consulting and general contracting in 2016, and construction coordination is available where engaged. The right structure — design only, design plus consulting, or a broader build role — is agreed per project.

What do I need to start?

For a multiplex: the property address and any survey or drawings you have. For a custom home: the lot information and your brief — how you want to live in the house.

How long does the whole process take?

It depends on the project, the permit authority’s timelines, and the complexity of the site. We confirm a realistic timeline when we scope your project, rather than promising a date before we have seen the lot.