Multiplex Design in Toronto, Engineered for MLI Select

Expose Design Group designs five-to-seven-unit multiplexes across the Greater Toronto Area for investors who want rental buildings that are buildable, financeable, and designed to hold their value. Our work starts with the land and ends with permit-ready drawings — and, where the project needs it, construction coordination through the build.

Expose was founded in Toronto in 2015 by Orod Tajdaran, an architectural designer and consult-build with 28 years in construction and 20 years as an architectural designer and interior designer. Orod is not a BCIN designer; Expose’s drawings carry the stamp of its professional engineer partner. Orod is described as an architectural designer, never as an architect — a protected title in Ontario.

Every outcome on this page is labelled either ACHIEVED (done) or PROPOSED (not yet built or achieved). We do not blur the two.

What we do

  • Lot and feasibility reads — before you buy or commit: zoning, as-of-right unit counts, setbacks, angular planes, and what the site can realistically carry.
  • Unit mix and MLI points scoring — we model unit mixes against CMHC MLI Select criteria (affordability, energy efficiency, accessibility) so your design targets the financing, not just the bylaw.
  • Concept and schematic design — buildable concepts shaped by construction reality: structure, MEP routing, fire separations, and cost-aware detailing from the first sketch.
  • Permit-ready drawings — complete drawing sets coordinated for Toronto building permit submission.
  • Interior architecture — unit interiors designed for durability, tenant appeal, and long-term value.
  • Build-side coordination — we stay involved through construction, coordinating with your builder and engineers so the design intent survives contact with the site.

Our process

  1. Readiness Check (free, 20 minutes) — you bring the lot or the idea; we bring the honest read.
  2. Feasibility and unit mix — scored options with the MLI Select implications spelled out.
  3. Concept design — plans, massing, and a clear picture of the finished building.
  4. Permit drawings — a coordinated set, ready for submission.
  5. Construction support — site coordination through to completion.

Why design decides MLI Select outcomes

MLI Select rewards affordability, energy performance, and accessibility — and every one of those is locked in at the design stage. Unit sizes, building envelope, and accessibility features cannot be value-engineered in later without losing points. Designing for the scorecard from day one is the difference between approved financing and a redesign.

Case Study 1: 21 Winlock Park, North York — 5 Units, MLI Select

Location: 21 Winlock Park, North York, Toronto. Building: five-unit multiplex, approximately 12,000 square feet. Build value: approximately $5 million. Financing: $4 million in CMHC MLI Select financing, recorded for five units. Expose’s role: designer and construction consultant. Current status: permit issued and mid-build — main building permit 25 167463 (HVAC revision 25 167463 HVA 01 MS issued Aug 28, 2026); garden suite permit 26 125778 HVA 00 MS issued Aug 7, 2026. Framing inspections passed, envelope complete, interior finishes underway; completion ~Mar 2027, occupancy end May 2027.

The building was designed as a multiplex that looks like a custom home: a brick facade with black window frames and balcony accents, generous glazing, and two separate ground-level entrances with garage access below. The form follows Expose’s standard method — check the land first (five-unit minimum achievable, unit sizes under as-of-right zoning), then area rents, then the typology that maximizes rent and unit mix. At this size, townhouse and stacked-townhouse forms are preferred over condo-style layouts because they deliver better rents at the same unit size, waste less area on lobbies, elevators, and common corridors, and cost less to build.

Outcomes: ACHIEVED — design completed by Expose as designer; construction-consultant role engaged. ACHIEVED — $4 million in CMHC MLI Select financing recorded for five units. ACHIEVED — permit issued (main building permit 25 167463, with HVAC revision issued Aug 28, 2026; garden suite permit 26 125778 HVA 00 MS issued Aug 7, 2026). Construction is mid-build (framing inspections passed, envelope complete, interior finishes underway). PROPOSED (not yet achieved) — construction completion and occupancy (~Mar 2027 completion, occupancy end May 2027). The building is not finished, and no rental income has been verified for it.

What this project proves: that a five-unit North York multiplex, designed around MLI Select from the start, can secure $4 million in program financing on an approximately $5 million build value — and that the design work, not just the financing application, is what makes the project qualify.

Read the full case study

Case Study 2: 41 Athabaska Avenue, Toronto (2018) — 4 Units

Location: 41 Athabaska Avenue, Toronto. Building: four-unit building, more than 4,000 square feet. Value: approximately $3.5 million. Year: 2018. MLI Select financing: none — this project did NOT receive MLI Select financing, because it is below the five-unit minimum.

What was achieved: ACHIEVED — a completed four-unit small multi-unit building in 2018, at a value of approximately $3.5 million. ACHIEVED — full design and delivery experience at the small multi-unit scale, which is the foundation Expose’s five-to-seven-unit multiplex practice was built on.

This project is cited only as achieved small multi-unit experience. It is NOT an MLI Select project, and it must never be presented as one. Its value on this page is honest: it shows Expose was designing and delivering small multi-unit buildings years before the current multiplex program work, and it marks the scale threshold — five units — where MLI Select financing begins.

How We Decide Whether a Multiplex Works

We check the land first, before any design work: 1. Is a five-unit minimum achievable? Five units is the floor for MLI Select. If the lot cannot support five units, we say so early. 2. What unit sizes does as-of-right zoning allow? Zoning decides the envelope, and the envelope decides the units. 3. Are area rents worth building for? We check average rents in the area before recommending a unit count or mix. 4. Which typology maximizes rent and unit mix? At this size we usually prefer townhouse and stacked-townhouse forms over condo-style layouts, for the reasons above.

For five-to-seven-unit buildings we work toward the points that maximize amortization, but not blindly. Sometimes we deliberately accept 40-year amortization instead of chasing a higher points tier, when the tier would cost unit area and add construction cost — an elevator, for example — beyond what the loan and budget can carry.

Frequently asked questions

How many units can I build on my lot?

In many Toronto wards 5–6 units are now as-of-right, plus a garden suite — we verify the exact number for your lot before you commit.

What does multiplex design cost?

Every project is scoped individually after a free Readiness Check, so you know the full picture before spending anything.

Do you work with my builder?

Yes — we collaborate directly with builders’ teams through construction.

How long do permit drawings take?

Timelines depend on scope and municipality; we map it out at the concept stage and coordinate engineers to keep it moving.

Can you help with the MLI Select side?

We design to the scorecard and supply the design-side documentation your lender needs.

Planning a single custom home instead? See our custom home design service in Toronto.

Start with a free Readiness Check

Book a free 20-minute MLI Select Readiness Check: a one-page lot and financing snapshot for your project. Book your free call. See our Toronto project portfolio. Contact the studio.