You want to develop a five-to-seven-unit rental building in Toronto — from the first look at a lot through CMHC planning, design, permits, and the documents your lender needs. This page describes that full journey as Expose Design Group delivers it, stage by stage, so you can see what happens, in what order, and who is responsible for each part.
Expose Design Group is a Toronto architectural design studio founded in 2015 by Orod Tajdaran, an architectural designer and consult-build with 28 years in construction and 20 years as an architectural designer and interior designer. Orod is not a BCIN designer; Expose’s drawings carry the stamp of its professional engineer partner.
Stage 1: Land Assessment — Before You Commit
Every development starts with the land, and the land is tested before design, before financing discussions, and — ideally — before purchase.
- Can five units be achieved? Five units is the minimum for CMHC MLI Select. If the lot cannot support five units, the financing strategy changes entirely, and you should know that first.
- What does as-of-right zoning allow? Setbacks, height, coverage, and floor space limits decide the building envelope, and the envelope decides the units.
- Are area rents worth building for? Average rents in the immediate area are checked before a unit count or mix is recommended.
- What are the site constraints? Servicing, access, grading, trees, and heritage conditions are flagged early, because each one can remove a unit or add cost.
If you have not bought yet, this stage is delivered as a pre-purchase feasibility report: a plain-language document with the achievable unit range, the recommended mix and typology, the rent picture, the financing fit, and a risks register. If you already own the lot, the same assessment becomes the starting point for design.
Stage 2: CMHC Planning — Designing for the Program
MLI Select is not something you apply for after the building is designed. The building must be designed for the program from the start, because the program’s points — energy efficiency, affordability, and accessibility — are design decisions, not paperwork.
At this stage we:
- Test the recommended unit mix and typology against the program’s structure
- Identify which points tier the project can realistically reach, and what it would cost to reach the next one
- Make the tier trade-off explicitly: a higher tier can extend amortization, but if reaching it costs unit area or adds construction cost — an elevator, for example — beyond what the loan and budget can carry, we recommend deliberately accepting 40-year amortization instead
- Produce the design information your lender needs to assess the project: plans, areas, unit mix, and the basis for the program fit
We are not the lender and we do not arrange financing. Our job is to make the building qualify for the financing strategy you and your lender choose, and to document that fit clearly.
Stage 3: Architectural and Interior Design
With the land assessed and the program shape settled, the building is designed as a whole: exterior architecture, floor plans, and interior design developed together.
At the five-to-seven-unit size we usually prefer townhouse and stacked-townhouse forms over condo-style layouts. The reason is financial as much as architectural: townhouse and stacked forms deliver better rents at the same unit size, waste less area on lobbies, elevators, and common corridors, and cost less to build. Every square foot that is not rentable is a square foot the rent math does not reward.
Interior design here means interior architecture — room planning, circulation, ceiling heights, staircases, millwork, and light — not decoration or styling. The interior is planned with the exterior, so the house reads as one coherent building inside and out.
Stage 4: Permits
A building permit is required even when a design is as-of-right. Expose prepares the permit submission package: the drawing set, the required forms, and the supporting documents, stamped by our professional engineer partner.
The owner reviews and approves the package before anything is submitted. Some portals require the owner’s own login or acceptance of terms of use, which only the owner can complete. Expose cannot sign or stamp on the owner’s behalf. Once submitted, Expose follows up with the city by email.
Stage 5: Consultant Coordination
A rental development needs more than one discipline. Expose coordinates the consultant team so the disciplines agree with each other:
- Expose: feasibility, architectural design, interior design, permit package, and overall coordination
- Professional engineer partner: stamping of the drawings, and structural engineering as required
- Other licensed consultants: engaged as the project requires — for example, mechanical, grading, or servicing specialists where the site demands them
- The owner: approvals, signatures, portal acceptances, and decisions at each stage gate
Coordination matters because the most expensive problems in a development are the ones where two disciplines disagree — a structural requirement that breaks a floor plan, or a servicing condition that moves a unit. Those conflicts are cheapest to resolve on paper, before construction.
Stage 6: Construction Coordination and Lender Documentation
Where engaged, Expose stays involved through construction as construction consultant: reviewing progress against the drawings, coordinating with trades and consultants, and resolving the buildability questions that only appear once work starts. This is the consult-build role — design that was made to be built, supported by someone who has built.
Through all stages, the project accumulates the documentation a lender needs: the feasibility basis, the design package, the permit record, and the construction record. Keeping that documentation organized from Stage 1 — rather than assembled at the end — is what makes lender conversations smoother and faster.
A Documented Example
21 Winlock Park, North York — a five-unit multiplex of approximately 12,000 square feet, with an approximate build value of $5 million, which received $4 million in CMHC MLI Select financing recorded for five units. Expose’s role: designer and construction consultant. Current status: permit issued and mid-build — main building permit 25 167463 (HVAC revision issued Aug 28, 2026); garden suite permit 26 125778 HVA 00 MS issued Aug 7, 2026. Framing inspections passed, envelope complete, interior finishes underway; completion ~Mar 2027, occupancy end May 2027. The building is not finished and no rental income has been verified for it. We label that honestly, because a development partner who blurs proposed and achieved outcomes cannot be trusted with your capital either.
What Expose Does Not Do
We do not take small renovation or basic permit-drafting jobs — no load-bearing wall removals, window or door openings, or kitchen extensions as standalone work. We do not arrange financing, appraise property, or give legal advice; your lender, appraiser, and lawyer cover those.
Frequently Asked Questions
With the lot. A lender cannot fix a lot that does not support five units or the rents you need. Assess the land first, then take a project that works to your lender.
It depends on the lot, the permit authority’s timelines, and the complexity of the site. We confirm a realistic timeline when we scope your project, rather than promising a date before we have seen the land.
Yes. Five units is the minimum. Below five units, the project is designed and financed differently.
The whole journey described here — feasibility, program planning, design, permits, consultant coordination, and construction consulting where engaged — is the service. The right scope for your project is agreed at the start.
The property address and anything you already have: a survey, a listing, or existing drawings. If you only have the address, that is enough to start.