What Permits Do I Need to Build a Multiplex in Toronto?

A Toronto multiplex is not one permit — it is a small stack of them, and the stack depends on the lot. Investors who budget for “the permit” and then discover there are three more usually find out at the worst moment: after the lot is bought and the design is already drawn. Here is what the stack normally looks like.

1. The building permit — the main one

Every multiplex needs a building permit for the main building. The application is a permit-ready drawing set: architectural drawings, structural drawings, and the supporting schedules the city asks for. At Expose, the drawings go out with our professional engineer’s stamp — that is how a design firm without a BCIN designer issues a permit set in Ontario. The permit is issued against a specific design on a specific lot, so nothing about it is transferable: change the unit count, the form, or the lot, and the permit changes with it.

2. A demolition permit — if there is a house to remove

Most Toronto multiplex lots already have a house on them. If the plan is a teardown and rebuild, the existing house needs its own demolition permit before anything comes down — a separate application from the building permit, with its own conditions. If the plan is to keep and convert the existing house instead, there is no demolition permit, but the conversion itself is a different design problem — see our guide on whether you need a zoning change first, because the zoning read decides which path is even possible.

3. A separate permit for the garden suite — when the fifth unit is one

Where the as-of-right ceiling is four units and the fifth unit is a garden suite — the model our 21 Winlock Park case study uses — the garden suite is permitted separately from the main building. At Winlock, the main building permit and the garden suite permit are two different permit numbers, issued on different dates. Budget and schedule for two permit tracks, not one: the garden suite has its own drawings, its own review, and its own inspections.

4. Servicing, grading, and site permits — the ones people forget

A multiplex changes what the lot asks of the city’s infrastructure, so the city asks for more than the building drawings. Depending on the lot, that can mean a water service application, a sewer connection through the residential Flat Rate program, a lot grading plan, and a construction access permit for work in the road allowance. None of these is the building permit, and none of them is automatic — each is its own application with its own review. At Winlock, the sewer connection alone runs through a separate program with its own timeline, and the construction access permit at another of our sites is still waiting on three answers about the road allowance before it can even be filed.

5. How to know which permits your lot needs

The permit list is a lot question, not a generic one. Before you buy, ask for a lot read that names the permits: the building permit for the main building, whether a demolition permit applies, whether a garden suite permit is part of the plan, and which servicing and site permits the lot will need. That list is what the design, the budget, and the schedule are actually built on — and it is also what decides how long multiplex permit drawings take in your case, because each permit in the stack has its own review.